We produce of any complexity exhibition stands. 7 000 per m2

Installation of stands throughout Russia, accreditation at all exhibition

Decoration of interiors, showrooms, restaurants, shops

Reservation of area, selection of personnel for exhibition stands

Work on mock-ups and graphics

Manufacture and rental of equipment for exhibition stands

Delivery of foreign goods and exhibits to the exhibition, customs clearance

Submit feedback

We work 24/7

15-year experience in the construction of exhibition stands

Full time cycle production

We own our own park of furniture and multimedia equipment

Control of production at each stage of production

Modern equipment, high-quality certified materials

Our Clients

Нажмите на логотип, чтобы прочитать отзыв
Нажмите на стрелки, чтобы увидеть больше клиентов

Оставьте ваш номер телефона
и получите детальную консультацию

Получить консультацию

ВИДЕО-ОБЗОР

Посмотрите, как мы создаём стенды,
которые приковывают взгляды

Our News

http://www.pharmtech-expo.ru/en-GB/about.aspx
30.11.2017
Mitex exibition
12.11.2017
Building Kapous stand at InterCHARM exibition
01.11.2017
Building Bauer at PCVExpo
01.11.2017
Exhibition stand of the companies "Moscow Jewelry Factory" and "Efremov" at the exhibition "Junwex 2017"
15.09.2017
Construction of the stand for Nanodent at the Dental Expo 2017
14.09.2017
Letter of gratitude from "Normark"
10.09.2017
Letter of gratitude from "SDT-IMPEX"
10.09.2017

Recent projects

Every day we create something new

Technofilter

Discover price

Area 32 sq.m.
Installation time 2 days
Design type Upper Standart
Floors 1 floor

Fiolent

Discover price

Area 28 sq.m.
Installation time 2 days
Design type Upper Standart
Floors 1

BAUER

Discover price

Area 32 sq.m.
Installation time 3 days
Design type exclusive
Floors 1

Kapous

Discover price

Area 132 кв.м.
Installation time 3 days
Design type exclusive
Floors 1

Free rent panel TV or Set exhibition furniture

Введите номер телефона
Submit feedback

Portfolio

3D model
Area 230 кв.м.
Installation time 4 days
Design type exclusive
Floors 1

MYUZ LUKAS Gold

Discover price

http://intek-expo.ru/wp-content/uploads/2017/11/IMAG0007-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMAG0010-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMAG0016-700x1244.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMAG0018-700x1244.jpg
3D model
Area 64 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Kubota

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-29-18-50-24-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-29-18-50-49-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-29-18-52-19-e1509401387718-700x933.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-29-18-56-51-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-31-12-53-04-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-05-31-12-55-19-e1509401356451-700x933.jpg
3D model
Area 184 m2
Installation time 4 days
Design type Exclusive
Floors 1 floor

Ministry of tourism of Hungary

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-05-15-42-16-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-05-15-42-54-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-06-10-21-19-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-06-10-21-19_1491230293-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-06-10-22-43-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-06-10-22-43_1491230212-700x525.jpg
3D model
Area 40 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Bauer Compressors

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-16-19-03-16-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-16-19-03-28-e1509398169779-700x1244.jpg
3D model
Area 32 sq.m.
Installation time 2 days
Design type Upper Standart
Floors 1 floor

Technofilter

Discover price

http://intek-expo.ru/wp-content/uploads/2017/11/^73E114F661378F6FDD98CC878E7B6ED02617F261A28A4A703C^pimgpsh_fullsize_distr-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/^8DB371AEAE2D66B2BA7AFD22BCC90C89CB0F6D887D59D86BAB^pimgpsh_fullsize_distr-700x394.jpg
3D model
Area 28 sq.m.
Installation time 2 days
Design type Upper Standart
Floors 1

Fiolent

Discover price

http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171110_131744-e1510394221721-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171110_131657-1-e1510394198844-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171110_131724-1-e1510394168849-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171110_131750-1-700x933.jpg
3D model
Area 32 sq.m.
Installation time 3 days
Design type exclusive
Floors 1

BAUER

Discover price

http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171024_172655-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171024_173054-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171024_173113-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171024_173138-1-700x933.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/IMG_20171024_173204-700x933.jpg
3D model
Area 132 sq.m.
Installation time 3 days
Design type exclusive
Floors 1

Kapous

Discover price

http://intek-expo.ru/wp-content/uploads/2017/11/DSC08880-1-700x467.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/DSC08830-700x467.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/DSC08910-700x467.jpg
http://intek-expo.ru/wp-content/uploads/2017/11/DSC08786-700x467.jpg
3D model
Area 250 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Yamaha

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0159-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0163-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0875-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0878-700x342.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0880-700x509.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/Панавто-на-Боут-Шоу-2014-700x525.jpg
3D model
Area 120 m2
Installation time 3 days
Design type Improved standard
Floors 1 floor

Ministry of tourism of Finland

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2015-09-22-10-43-00-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2015-09-22-10-43-08-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2015-09-22-10-43-53-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2015-09-22-10-44-10-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2015-09-22-10-44-49-700x525.jpg
3D model
Area 60 m2
Installation time 3 days
Design type Improved standard
Floors 1 floor

PK DIA

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2014-11-10-19-18-45-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2014-11-10-19-18-46-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2014-11-10-19-19-34-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2014-11-10-19-21-29-700x618.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/МеталлЭкспо8-700x700.jpg
3D model
Area 33 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Pioner

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-16-24-30-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-16-26-02-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-20-15-05-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-20-16-27-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-20-16-45-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-07-05-20-17-07-700x525.jpg
3D model
Area 110 m2
Installation time 3 days
Design type Standart
Floors 1 floor

Panauto

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0136-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0853-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0856-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMG_0860-700x525.jpg
3D model
Area 68 m2
Installation time 4 days]
Design type Exclusive
Floors 1 floor

Onika

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-06-13-11-27-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-06-13-12-09-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-06-13-12-24-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-06-13-12-29-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-06-13-13-12-700x525.jpg
3D model
Area 240 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Normark

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2016-02-24-10-35-27-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2016-02-24-10-36-26-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-24-15-52-29_1491229451-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-02-24-15-56-54_1491229328-700x525.jpg
3D model
Area 64 m2
Installation time 3 days
Design type Improved standard
Floors 1 floor

Nanodent

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-04-19-12-00-22-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMAG0020-700x396.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/IMAG0026-700x396.jpg
3D model
Area 144 ь2
Installation time 4 days
Design type Improved standard
Floors 1 floor

EMERCOM of Russia

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/2017-06-03-14-25-30-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-06-03-14-28-14-700x700.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/2017-06-04-14-58-24-700x700.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/20170606_085818-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/20170606_085846-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/20170606_085921-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/20170606_085928-700x394.jpg
3D model
Area 64 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

John Deere

Discover price

http://intek-expo.ru/wp-content/uploads/2017/10/DSC_0022-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/DSC_0023-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/DSC_0026-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/10/DSC_0029-700x394.jpg
3D model
Area 32 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Bauer Compressors

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2016-10-25-09-12-36-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-10-25-09-12-59-e1506378531642-700x933.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-10-25-09-13-35-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/DSC_0732-700x465.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/DSC_0733-700x465.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/DSC_0735-700x465.jpg
3D model
Area 35 m2
Installation time 2 days
Design type Two floors
Floors 1 floor

Astropharm

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2016-09-22-14-46-39-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-09-22-14-46-58-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-09-22-14-47-43-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-09-22-14-50-10-700x394.jpg
3D model
Area 36 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Superbeer

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-44-41-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-45-31-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-45-41-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-46-15-700x394.jpg
3D model
Area 36 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Horpol

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2015-09-08-10-51-54-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2015-09-08-10-53-07-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2015-09-08-10-53-16-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2015-09-08-10-53-30-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2015-09-08-10-53-52-e1506379008445-700x933.jpg
3D model
Area 35 m2
Installation time 3 days
Design type Exclusive
Floors 1 floor

Hilltop

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2015-02-09-10-04-34-700x525.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2015-02-09-10-05-42-700x525.jpg
3D model
Area 39 m2
Installation time 3 days
Design type Improved standard
Floors 1 floor

ARGOS RUSIA

Discover price

http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-03-49-700x394.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-04-04-e1506379146591-700x1244.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-04-16-700x1244.jpg
http://intek-expo.ru/wp-content/uploads/2017/09/2016-02-08-10-04-26-e1506379173855-700x1244.jpg
Show more projects

Get a free 3D stand design

Введите номер телефона
Submit feedback

Your booth will be the most visited at the exhibition

Оставьте заявку прямо сейчас
и мы разработаем дизайн вашего стенда бесплатно!

Оставить заявку

Your booth will be the most visited at the exhibition

Design

Professionally and on time. Provide several options for design projects.

Construction

A detailed engineering study of the project. Competent selection of materials. A strictly individual approach.

Installation

Full support of the client during the exhibition. Assistance in organizing special events.

Qualitatively

Quality control at all stages of the work

Experts will establish the stand, fully compliant with the planned project

We produce stands only from new and high-quality materials

You will be assigned a personal manager with whom you can contact at any time

We have our own team of masters. We never resort to the services of contractors.

Choose a design for your stand

Standart

7 000 rub/m2

Reed More

Improved standard

10 000 rub/m2

Reed More

Exclusive

15 000 rub/m2

Reed More

Two floors

18 000 rub/m2

Reed More

Calculate the final price of the exhibition stand

Upload the ZIP archive and enter your phone number

Upload ZIP

Загрузить файлы
Submit feedback

Make sure that we are the masters of their craft

Feedback from our clients

Нажмите на логотип, чтобы прочитать отзыв
Нажмите на стрелки, чтобы увидеть больше клиентов

Оставьте ваш номер телефона
и получите детальную консультацию

Получить консультацию

The steps of creating a stand

Drawing up of the technical task, development of the concept of the future stand and preliminary sketch. A detailed detailed technical task will help to formulate and maximally satisfy your wishes for the future exhibition stand.

Develop a design project and provide the customer with a 3D model of the stand with all necessary cuts and high-rise grids. Depending on your requirements and budget guidelines, our designers will select suitable materials for the stand design.

Corrections and finalization are made after presentation of the developed design project. At this not unimportant stage, when there is a three-dimensional image of the stand before our eyes, we bring the draft to the ideal.

Development of technical documentation is carried out after the final approval of the project. The engineer designs the design of the stand, makes working drawings, produces all necessary power and load calculations, after which information and drawings are submitted for agreement to the organizers of the exhibition and for production.

Preparation of the stand and assembly of the main components of the construction at the production begins 3-4 days before the exhibition, depending on the complexity of the future stand. At this stage, the key nodes of the stand are assembled with the possibility of their transportation to the venue of the exhibition.

Installation of the stand is carried out on the exhibition site at the time fixed by the organizer. On the last day of the installation work, we deliver the stand to the customer and bring in the exhibits. After the end of the exhibition, the stand is dismantled and the material removed from the exhibition area. By agreement with the customer, the exclusive stand elements developed specifically for this event can be transferred to the customer's property or saved to the next exhibition at our production.

Our articles

Your unique view on stand
20.11.2017
Ways of effective participation in the exhibition
29.09.2017
7 advantages of the exhibition before other advertising methods
29.09.2017
Preparation for the exhibition
28.09.2017
pendant equipment for exhibition stands
27.09.2017
Finishing materials used in the manufacture of stands
27.09.2017
Selection of stand lighting
27.09.2017
Floristic decoration of stands
26.09.2017

Office :

123290, Moscow, 1-ый Krasnogvardeisky st, 12

+7 (499) 795-18-34

Working hours: 10-00 до 18-00
Day off: Saturday and Sunday

Manufacture :

123290, Moscow,
Prichalnyy st., 8

+7 (499) 795-18-34

08-00 до 17-00
No day off

Requisites:

ООО «ИНТЭК»

ОГРН 5087746607911

ИНН/КПП 7734597560/772401001